Track record
Selected civil, mechanical, electrical and manpower scopes delivered for operators and EPC contractors across the Kingdom.
-
2026
Dora International CompanyPower plant development and expansion projectIn progress- Reinforced concrete works (labour only)Civil / concrete
Rebar fixing, shuttering and formwork, concrete pouring and vibration, and curing for 50,000 m³ of reinforced concrete.
-
2026
National Water CompanySafwa sewerage project, via Al Rafia ContractingIn progress- Manhole finishing worksCivil / infrastructure
Finishing of sewer manholes at depths up to 5 m, as workmanship for the main contractor.
-
2026
Jubail Gas Plant Co.Jubail Industrial City- Admin building extensionCivil / MEP
Civil, structural, MEP and finishing works for an 80 m² admin building extension: reinforced concrete, plumbing, electrical and finishes.
- Office renovation and cylinder warehouseCivil / renovation
Renovation of existing offices and a cylinder-filling warehouse: blockwork, plumbing, electrical, tiling, painting and sandwich-panel roofing.
-
2026
Sinopec Tech Middle EastAl Khobar- Insulated sandwich-panel buildingSteel / civil
Factory-built insulated sandwich-panel building (131 m² walls, 78 m² roof) on reinforced-concrete pad foundations, with steel door.
-
2025
Al-Subul Al-Masiya TradingAbu Ma’an- Warehouse design and buildCivil / structural
Turnkey design and construction of a 3,800 m² warehouse: foundations, steel structure, roofing, doors and tank.
-
2025–26
National Water CompanyAbu Ma’an, Qatif: lift stations, force mains and gravity lines. Main contractor: Al Rafia Contracting- Sewage network worksCivil / infrastructure
Gravity and pumping sewage networks: deep excavation, GRP pipelines, manholes and reinstatement to NWC standards.
-
2021
Expertise ContractingJubail- O&M safety manpowerManpower / HSE
Certified safety officers supporting operations and maintenance activities.
-
2021
Khafji Joint Operations (KJO)Al Khafji, civil maintenance contract- Foundation repairCivil / concrete
Repair of damaged concrete AV-1 and AV-2 foundations.
-
2020
Albilad Fire FightingFarabi Downstream plant- RTR pipe-joint worksMechanical / RTR piping
Fabrication and installation of RTR pipe joints from 6 to 16 inches.
-
2018–19
Saudi Arabian Kentz (SNC-Lavalin Group)Al Khobar and Turaif- Electrical and pipe-fitting manpowerElectrical / piping
Qualified electricians and pipe fitters for works in Al Khobar.
- RTR and mechanical worksMechanical / RTR
RTR supervisors, fabricators, technicians and pipe fitters mobilised to the Turaif (ISF) site.
More from our sites
Further photos from our sewer, pipeline and excavation work. Tap a photo to enlarge it.
Compaction testing on trench backfill Compacting trench backfill Hydrostatic pressure test HDPE electrofusion tee Checking trench depth Trench works in Riyadh Sandwich-panel building under construction Excavated trench between safety barriers GRP manhole inside a shored excavation Twin large-diameter GRP lines Sewer network: excavation, shoring and manhole installation Jointing GRP pipe on site Crane lift of a GRP pipe section Laying corrugated pipe in Samtah, Jazan Checking trench depth in Samtah, Jazan Excavation works in Samtah, Jazan
Planning a project or need crews on site?
Send us the scope, drawings or manpower list and our projects team will prepare a quotation.